Inside Our Workshop: Daily Maintenance, Inspection, and Manufacturing Rigor at Juneng Machinery
| Equipment Category | Unit / Brand Reference | Focus Area | Operational Standard |
|---|---|---|---|
| Disc Centrifuge Maintenance | ALFA LAVAL / Disc 1, Disc 2 | Cover plate hoisting & bowl alignment | Dynamic balance verification & seal check |
| Separator Overhaul | WESTFALIA SEPARATOR | Heavy mechanical drive & bearing seating | Structural torque test & shaft alignment |
| Stainless Steel Vessels | Unit 3, Unit 4 | Agitator motor mount & nozzle piping | Pressure boundary & weld line inspection |
| Fluid Transfer Infrastructure | Industrial Pump Array | Line pressure monitoring & insulation | Leakage check & motor vibration check |
- Conduct pre-assembly inspections for all machined mechanical surfaces and seal rings.
- Utilize calibrated overhead cranes for safe handling of heavy separator covers and motor assemblies.
- Perform static and dynamic balance tests on high-speed rotating components prior to casing closure.
- Maintain strict housekeeping and tool control across all assembly lanes to prevent contamination.